6207 Jim Snow Way · Chattanooga, TN 37421
Office 423.541.3210 · Fax 423.541.3209

Line Break Permit

Opening piping, hoses and process equipment that has held hazardous material

Required before any line, hose, pump, vessel or flange that has held acid, caustic, steam, ammonia, flammable, combustible, oxidizer or toxic material (or anything above 140°F) is opened. No OSHA form exists for this task; the controls come from OSHA 1910.147 (lockout), 1910.1200 (hazard communication), 1910.146 (if the equipment is a confined space) and 1910.119 at process-safety-managed sites. Where the customer issues its own line-break or work permit, that permit governs and this form is attached to it.

Job and system
Contents and hazards
Isolation

Choose how the line was isolated. If none of these can be done, stop and get manager and safety approval before going on.

Preparation checklist

Assume the line is full and pressurized until it is opened and proven clear. A “No” means do not break the line.

Before the line is brokenYesNoN/A
Line depressurized, pressure verified at zero (gauge or open bleed)
Drained; low points and dead legs checked
Flushed or purged where required, and rinse / purge discharge handled safely
Lockout / tagout applied to all related equipment (pumps, agitators, automatic valves)
Automated valves are not relied on unless the power source is disconnected and position verified
At least two people on the job
Eyewash / safety shower location identified and path clear
Fire watch and extinguisher in place (if flammable or hot work nearby)
Spill containment / drain pan and spill kit ready
Area barricaded or a watchman assigned until the line is open and verified
Safety data sheet for the contents reviewed with the crew
Nobody below or in the line of fire; no overhead break while standing under it
Pipe or fitting supported so it cannot drop or swing when loosened
Flange shielded (canvas or plastic) where practical
Gas / vapor testing

Test lines holding flammable or respiratory hazards with a calibrated instrument before starting and again once the bolts are loose. Readings of 1% LEL or more turn amber (continuous monitoring and added controls); 10% LEL or more, or oxygen outside 19.5–23.5%, turn red (stop).

#ByTimeLEL %O2 %Toxic gas / ppmStage
1
2
3
4
Protective equipment

Wear full PPE until the system is open and proven clear. Any reduction needs the approver’s agreement and is recorded below.

Permit approvals
Opening practices
Loosen the bolts on the side away from you first. Break the flange seal carefully, confirm the line is drained and clear, then remove the remaining bolts. Keep out of the line of fire and do not over-reach. Never break a chemical line overhead while standing under it.
Reinstatement

Complete when the work is done. Open this record again in edit mode to add it; the original stays on file.

Before the line is returned to serviceYesNoN/A
New gaskets / seals installed; flange faces clean and undamaged
Bolts tightened in sequence to the specified torque
All blinds and spades removed and accounted for
Leak or tightness test completed, result acceptable
Lockout / tagout removed per the LOTO permit
Area cleaned, barricades and tools removed